See the bottlenecks.Keep quality in view.

How Torsion Homes turned its existing construction data into live operational reporting—helping its team understand performance, investigate delays and focus on the builds that need attention.

Bottlenecks
made visibleTiming and quality
in one placeCurrent reports
on demand
About Torsion Homes
Torsion Homes builds residential homes across South East Queensland. Managing multiple builds means coordinating supervisors, trades and construction stages while keeping a close eye on timing and quality.
The information was there.
The bigger picture was harder to see.
Torsion already used iHub to manage its builds. It held the schedules, progress updates and handover items needed to run individual jobs. But for Construction Manager Troy Brooks, getting a clear view of performance across the business was more difficult.
Which stages were taking longer than expected? Were delays isolated to one build, or happening across several jobs? Were handover fix-ups increasing? And where should he focus his attention first?
CODENAME worked with Troy and the Torsion team to develop reporting around those questions, bringing the information already recorded in iHub into a clear, accessible view of the operation.
What changed for the team
See where the bottlenecks are
Move from the overall picture to a particular build or stage. See where work is taking longer than expected, then investigate what is causing the delay and where extra support may help.
Keep quality in view
Bring handover fix-up items together to see trends across jobs and over time. Monitor the standard of the finished work alongside the speed of construction.
Have more useful supervisor conversations
Filter reports for an individual supervisor and review their jobs together. Construction types, expected timings and recorded delays help put differences in context.
Focus on the builds that need attention
Open a job that is falling behind and look at its stages. Direct attention where it is needed, while keeping an overview of the work that is progressing well.
Open a report. Get the current picture.
Reports update automatically from the operational data. Troy can review performance, prepare for a meeting or share a report without first assembling the numbers by hand.
Engaging CODENAME to assist us with our reporting has been a game changer. Whilst the construction industry can be quite chaotic, we now have reporting in real time assisting us to build quickly and efficiently without compromising the high-quality standards we set ourselves.”
From everyday data to useful answers
The reporting builds on Torsion’s existing system. Information recorded as part of running each build becomes useful for understanding the whole business.
- Step 1
Keep using iHub
Record progress, timing and handover items.
- Step 2
Bring it together
Connect the operational data to custom reports.
- Step 3
See the pattern
Review jobs, supervisors, stages and trends.
- Step 4
Focus the effort
Investigate issues and decide where to act.
Find the stage. Focus the effort.
| Stage | Expected and actual days |
|---|---|
| Slab | |
| Roof | |
| Plasterboard | |
| Paint & tile | |
| Finishing |
Troy can start with the overall picture, open a build that is falling behind and see how its stages compare with expected timings. If a stage is taking longer across several jobs, that gives him a starting point for investigating a wider bottleneck.
For example, a delay around painting might prompt a conversation about trade availability, scheduling or additional capacity. The report helps identify where to look; the team brings the experience needed to understand the cause and act on it.
More answers from the same data
The same operational data helps Torsion understand handover quality, put build performance in context and give the whole office a shared view of progress.
Keep speed and quality in the same conversation
Bringing handover fix-ups, known internally as H1s, together makes it easier to see trends across jobs, supervisors and reporting periods. An increase gives Troy a signal to investigate, helping him monitor the standard of the finished work alongside construction timing.
Put performance in context
Highset and lowset homes have different requirements. Weather, holds and extensions of time also affect build duration. Filters and adjusted timing help Troy understand those differences, review an individual supervisor’s jobs and export the relevant report for their next meeting.
A shared view for the office
Company-level TV dashboards bring construction timing, efficiency and quality into everyday view. While Troy uses the detail for supervisor conversations, the wider team can walk past a screen and see how the business is tracking as a whole.
What could your operational data tell you?
Your business may already capture the information needed to understand delays, workload and quality. We build reporting around the questions your team needs answered, connecting the detail of everyday work with the decisions needed to run the business.